panama
plant
2009 – 2010
2 screening and crushing: one in the Pacific side, at the lock of Miraflores, one in the Atlantic side, at the lock of Gatùn
Production of the Miraflores plant: 3.300 t/h
Production of the Gatún plant: 1.500 t/h
Steel carpentry: 2.400 t
Containers of materials departing from Italy: 290 (of which 5 were bolts only)
Area occupied by materials to be pre-assembled on the Pacific coast : 30.000 mq
Energy required by the two systems: 14.000 kW
Time to build and ship the plant to the site: 4 months, from February 2010 to May 2010
Time to assemble and start up the entire plant: 6 months, from June 2010 to December 2010
Amount of the order obtained by ICM: 37 million dollars.