panama
plant
2009 – 2010

2 screening and crushing: one in the Pacific side, at the lock of Miraflores, one in the Atlantic side, at the lock of Gatùn
Production of the Miraflores plant: 3.300 t/h
Production of the Gatún plant: 1.500 t/h
Steel carpentry: 2.400 t
Containers of materials departing from Italy: 290 (of which 5 were bolts only)
Area occupied by materials to be pre-assembled on the Pacific coast : 30.000 mq

Energy required by the two systems: 14.000 kW
Time to build and ship the plant to the site: 4 months, from February 2010 to May 2010
Time to assemble and start up the entire plant: 6 months, from June 2010 to December 2010
Amount of the order obtained by ICM: 37 million dollars.

ICM S.r.l.
Società a socio unico soggetta a direzione e coordinamento di DUE M s.r.l.

Via Don Sasselli d'Era, 26
37041, Albaredo d'Adige
Verona, Italia

 

CONTACT

+39 045 66 00 611
info@icmcave.com
icmcavesrl@pec.it
P.I. e C.F. 02895560239
REA n.293435/VR
Cap. Soc. € 10.200,00

 

My Agile Privacy

This site uses technical and profiling cookies. 

You can accept, reject, or customize the cookies by clicking the desired buttons. 

By closing this notice, you will continue without accepting.