+39 045 6600611 INFO@ICMCAVE.COM

TAGIKISTAN
plant
2017 – still in operation

The plant supplied by ICM us used to treat the material previously excavated by another contractor to make it conform to specifications and be able to place it in the dam.

The plant consist of a primary station that feeds an intermediate heap (surge stock pile) with a recovery tunnel that in turn feeds the belt that brings the material into the dam.

Material: Alluvional
Size: 0-1.100 mm
Production: 3.000 ton/h
Classes: 0/700 mm
Primary: JC 54.60

ICM S.r.l.
Società a socio unico soggetta a direzione e coordinamento di DUE M s.r.l.

Via Don Sasselli d'Era, 26
37041, Albaredo d'Adige
Verona, Italia

 

CONTACT

+39 045 66 00 611
info@icmcave.com
icmcavesrl@pec.it
P.I. e C.F. 02895560239
REA n.293435/VR
Cap. Soc. € 10.200,00

 

My Agile Privacy

This site uses technical and profiling cookies. 

You can accept, reject, or customize the cookies by clicking the desired buttons. 

By closing this notice, you will continue without accepting.